Installation of a new 161kV Bay

Amped I has completed the design and engineering of the installation of a new 161kV Bay including revenue metering and DFR additions. This consisted of adding a new 161kV Circuit Breaker, replacing an existing oil circuit breaker with an SF6 Breaker. Adding two new 161kV disconnect switches, a new 161kV CCVT, a motor operated disconnect…

Installation of new 115kV to 12kV Substation

Amped I recently completed the installation of a new 115kV to 12kV substation which included design for Microprocessor Relaying, SCADA System, Transformer Monitoring, and Regulator Controls. P&C design for installation of new substation that included, Install modern controls, relaying, communication equipment, batteries, battery charger and a new SCADA cabinet which include, SEL-587 and SEL-351S for…

Montana Wind Farm 230kV Substation Interconnect

Amped I recently completed the P&C design for the installation of new interconnection 230kV substation with three 230kV circuit breakers connecting to two 230kV transmission lines and one 230kV wind farm interconnection. Our design included: One fiber rack.Four relay panels consisting of, Transmission line protection SEL-421 and SEL-421 Bus Protection Two (2) SEL-387E Breaker Failure…

300 MVA Transformer Replacement

Amped I has completed turnover of a replacement of a 300 MVA transformer in the downtown of a major metropolitan city. This design included new power system transformer protection and bus protection. It also included integration of serial communication for transformer monitoring as well as microprocessor relay SCADA.

Greenfield Substation Design at Calcasieu Pass LNG

Amped I has recently completed the development of relaying for the remote ends from a GIS substation with both line protection and transformer protection. P&C design for installation of new substations included 34 Relay Panels consisting of: Primary Relay Panels each having, Transformer Protection consisting of GE T90 Relay & LOR 138kV Line Protection GE L90…