Protection & control engineering for the modern grid.
Since 2010, utilities and EPCs have trusted Amped I with the hard part: brownfield upgrades that interconnect new technology into decades-old schemes — from 12kV feeders to 500kV nuclear substations.
Four disciplines. One team that speaks legacy and modern.
Exceptional design engineering for the power transmission and distribution industry.

Protection & Control
Brownfield is our specialty — interconnecting new equipment into old schemes. We know how yesterday’s technology connects to today’s.

SCADA & Communications
Substation communications, supervisory control and the networks underneath them — fiber, copper and IP.

Substation Engineering
Smart and intelligent upgrades, integrated substation design, and everything a control house needs to work.

Distribution Engineering
Integrating new technology into the smart grids of cities — helping utilities become more efficient and sustainable.
Projects, straight from the field.
Published from our internal project system as work completes — so what you see here is what we’re actually doing.
500kV500kV Nuclear Substation Full Relay Upgrade
Complete protection and control relay upgrade for an entire 500kV nuclear substation — five 500kV lines, two 500/230/12kV transformers, two capacitor banks and twenty MODs, with all-new microprocessor relays across 27 new panels.
Read the case study →
100kVSolar & Wind Interconnection — 100kV Substation Expansion
Renewables-driven expansion of a 100kV substation: full protection and control relay upgrade for the site, a new control house, and six and a half new relay panels designed by Amped I.
Read the case study →
138kVIntelligent Substation Upgrades — IEC 61850
P&C design and engineering for four IEC 61850-compliant intelligent substations — all-new relaying with redundant fiber, new batteries, auto-throw-over, and DNP integration with fire protection. Schemes include time-programmed tripping, load shedding and auto bus-tie closing.
Read the case study →
12–34kVDistribution PMU Installation Program
Program-scale Phasor Measurement Unit rollout across 30+ distribution substations: PDC cabinets, satellite timing, ethernet switching and relay upgrades — grid frequency visibility at the distribution edge.
Read the case study →We break the mold of traditional engineering firms.
We invest in our employees and our communities. Every completed project plants a tree. Our operations run on renewable energy. And we practice the UN’s 17 Sustainable Development Goals — not as a poster, but as policy.

Have a substation that needs to get smarter?
Tell us about your program — we’ll bring the brownfield experience.
Start a Conversation