The scope of work for the expansion of the 100kV substation consisted of upgrading all the existing protection/control relays for the entire site. This included the installation of a new control house in which Amped I provided the design for six and a half new relay panels.
The design involved three 100kV lines (breaker and a half configuration), one 69kV line, one 100/69kV Auto Transformer, one 100/12.5kV Transformer, six new 12.5kV feeders and two 100kV buses.
AMPED I’s technical role in upgrading the substation included:
For this project the following relays were included:
• (1) SEL-2440 RTAC (SCADA
Amped I designed and provided the new schematics package for IFA along with the associated demolition drawings. Amped I incorporated all comments on the schematics package prior the IFC submittal. Amped I also designed the wiring drawings package and submitted for IFC.
AMPED I provides exceptional design engineering services for the power transmission and distribution industry including:
One Lines, Three Lines, AC/DC Schematics, Wiring Diagrams, SCADA/RTU and related documents.
Fiber, Power Line Carrier, Audio Tone, Microwave, JMUX and other communication means.